I have just checked the reports (= podcasts) of the Pontydysgu colleagues from Online Educa Berlin 2013. This reminded me that it was about one year ago and exactly during that conference that I started my new career as blogger on the work of the ITB (Institut Technik & Bildung) team in the Learning Layers project.

Looking back, I see that I have covered different periods of the Learning Layers project and of the work of our team:

In November 2012 I wrote some blogs with which I worked myself in into the project (by looking at lessons from predecessor projects (e.g. expertAzubi and TACCLE2) and raising some common issues regarding our work with partners in construction sector.

In December 2012 I started producing reports on site visits to our application partners (Bau ABC in Rostrup and Agentur/Netzwerk Nachhaltiges Bauen in Verden) and to partner enterprises. My question was: “What do we learn from site visits?”

In January/February 2013 there were reports on the Application Partner Days. At that time most of the consortium came to site visits as well and we had series of workshops. These were followed by blogs that prepared our contributions to the Design Conference (that took place in Helsinki in March 2013). My questions were: “What have we learned from Application Partner Days?“How do we take our lessons to the design activities?”

 In March 2013 there were reports on the results of the Helsinki Design Conference and further thoughts, how to get the local design activities organised. My question was: “How can we get the initial design ideas properly grounded?” 

In April/May/June 2013 there were less blogs but far more field activities and internal reports. The blogs written in June provided an overview of this phase in general, the workshops in Bau ABC (involving apprentices and trainers), the parallel activities with Agentur/NNB and with craft trade companies. The final blog of this phase gave insights into the stakeholder talks in the pilot region and into the explorations of our partners (CIMNE, I-Perform) on organised clusters and their roles in different European regions. My question was: “What are we learning in the current phase of our fieldwork?”

 In July 2013 there were no blogs due to summer holidays. Bau ABC was closed and most of the ITB team was on holiday as well. Yet, something was moving ahead with the pilots and with the design work.

 In August/September 2013 there was a new high season of manifold workshops. In my blogs of August I tried to put the newer developments into concept with my question: “What kind of transition phase are we going through in our fieldwork?” I discussed new developments in the design work (“Rapid Turbine prototype), in the workshops (shift of emphasis to design and training) and in stakeholder engagement (more direct dialogue on the LL project work and stakeholders priorities). Then, the flow of blogs was interrupted by a period of conference travels and the LL consortium meeting in Pafos.

 In September/October/November 2013 there has been a high season of preparing deliverables and other contributions to the Year 1 review. At the same time we have made important progress with workshops – in particular in developing the Multimedia training approach for construction sector. Sadly, there was no time to comment these steps with blogs – we were absorbed by the main duties.

Now, that we are heading towards the Year 1 review meeting in Barcelona, I find it appropriate to have a closer look at the recent progress in our fieldwork and how it is reflected in different activities.

To be continued …

Acknowledgements. This work is supported by the European Commission under the FP7 project LAYERS (no. 318209), http://www.learning-layers.eu.

Learning Layers – What kind of transition phase are we going through in our fieldwork (Part 4: Implications for accompanying research)

August 25th, 2013 by Pekka Kamarainen

In the previous postings to this series of blogs I have characterised the transition phase that we (ITB, Pontydysgu and Bau ABC) are going through with our fieldwork for the Learning Layers (LL) project.  I have firstly given a general overview (part 1), then looked at the particpative workshops (part 2) and then at the ongoing design work and planning of training concepts (part 3). In this final article I put into discussion some thoughts on the role of accompanying research (Begleitforschung) in such a transition phase.

As I see it, the tasks taken up in the Rapid Turbine initiative give rise to a complex research agenda, in which pedagogic challenges and socio-technical design processes become interlinked with each other. In this context research work and development work are interacting with each other as mutually complementing contributions to a participative development co-process with the users – firstly with trainers and  apprentices. Later on the process will also involve  also skilled workers and  company representatives from construction sector as well as vocational school teachers.

Instead of seeing the R&D processes as linear and expert-driven processes in which the users are seen as informants (in the beginning) and as testers of prototypes and pre-final solutions (at the end), the Rapid Turbine is being shaped on a participative and iterative process. In such a process the design workshops and learning events serve that purpose of raising the users’ awareness on possible solutions and their own capacity to contribute. At the same time the researchers have the opportunity to analyse, how the growing awareness of emerging solutions makes it possible for the users to change their own working and learning culture. Parallel to this the designers get new insights into key issues concerning the acceptability and possible benefits of the proposed solutions.

Below some key questions are formulated for such R&D dialogue, in which researchers, developers and users are challenged to find the turning points that help to overcome obstacles and to make the proposed solutions work in practice:

  1. How can potential users’ attitudes to mobile technologies, web tools and apps/services be changed in the course of pilot activities. Is it possible to overcome general rejection or mere leisure-time oriented consumerism and stimulate creative use to support working and learning?
  2. How can the use of such technologies, tools and apps/services help to bring the real working life closer to the learning situations in training centre? How can impulses and innovations be shared in such a way that they enrich working and learning culture?
  3. How can wider access to information and learning resources be linked to better understanding on the uses and quality of information? How can use of internet and new media help the users to assess their own learning and professional growth (what they can do and what they can’)?
  4. How can improved access to information and communication resources and media from different locations be utilised to make communication and knowledge sharing across the organisation more effective (as support for working and learning)?
  5. How can improved possibilities to record and analyse learning experiences at work to support professional development of individuals and knowledge sharing in organisations?

As has been indicated above, such questions cannot be answered a priori on the basis of purely observational research. Instead, the answers have to be found in the context of the participative process – with reference to trials and errors in different phases. Therefore, the research work has to be carried out as accompanying research that takes into account the open options, intervening factors and the actors’ choices in the pilot activities.

So, the researchers have to work  in the participative process and have an insight into changing circumstances, different interests, optional choices and new technical possibilities that come into picture during the work. This is what accompanying research has to conceptualise and analyse in such processes while working together with the developers and users.

And the story goes on …

PS. This posting (as the other three of the same series) has focused mainly on the cooperation of ITB, Pontydygu and Bau ABC with focus on the Rapid Turbine initiative. At the same time other members of ITB team have been working with other technical partners and the application partner NNB/Agentur with focus on the design idea Captus for the ecological construction work. As I have not been involved in the recent events, I have not been able to cover these developments.

Acknowledgements. This work is supported by the European Commission under the FP7 project LAYERS (no. 318209), http://www.learning-layers.eu.

Learning Layers – What kind of transition phase are we going through in our fieldwork (Part 3: Design process and training activities)

August 25th, 2013 by Pekka Kamarainen

In the first  post of this series of blogs I indicated that we (the ITB team together with our Pontydysgu colleagues and the application partner Bau ABC)  are going through a transitional phase in our fieldwork for the Learning Layers  (LL) project. In the second post I looked back at the shifts of emphasis that had characterised our field visits and workshops in Bau ABC since the first ones in winter to the latest ones before and after the summer holiday break. In both postings I made the point that we had moved from preparatory measures to work in the context of a participative design process. In this posting it is time to consider the implications of such process for the design activities themselves and for the necessary training activities to be planned and carried out.

In principle, there has been an implicit agreement among the LL partner that our project is not a “technology push” project. Neither have we seen our application partners as clients in the supermarket – making choices between ready-made solutions that are on the shelf. Instead, the emphasis has been put on participative co-design processes. Yet, it has been quite a challenge to get such processes take off in the domains and in the locations where we want to carry out pilot activities.

In the case of the Rapid Turbine initiative Graham Attwell has given some insights into the first steps of the design work, into the plans to produce videos (the helmet camera) and into conceptual challenges (“closing the gap”). Much of this design work is still on the way and the demonstrators are yet to come. However, we already know that much of the messages of trainers and apprentices have been taken on board. The important thing is that the Pontydysgu colleagues try to provide real support for completing working and learning tasks without dropping the idea of self-organised learning. Thus, the web tools and the software solutions are there to enhance the learners’ awareness of their own learning. At the end of the exercise, the apprentices should have a picture what they can do, what the cannot do yet and what challenges they can meet in the next phase. This is being discussed between developers, trainers and us, the accompanying researchers.

This has also implications for getting the forthcoming Rapid Turbine designs work together with existing applications and software solutions (such as the Reflect application for the LL project and the software for the assessment procedures in Bau ABC). In this way the support for project-based learning of apprentices would be linked to a tool that enables audio recording of learners’ reports and trainers’ feedback – and to the assessment processes. This, as we understand, will take some time and requires further efforts in the design process.

Parallel to this we have made progress in our discussions, how to give shape for training activities that would support the Rapid Turbine initiative and enhance the general media literacy of trainers and apprentices. Whilst the design work and the discussion on appropriate workshops were firstly taking off as two different things, they seem to be getting closer to each other. It is obvious that the design of the Rapid Turbine gives rise to specific training activities. These can be seen as one part of a wider range of training options to be considered together with the application partners. Here, we are pleased to be able to share experiences with the EU-funded TACCLE projects that have a long experiences with such workshops for teachers to help them produce user-generated web content.

Here I need to stress that both the design work for Rapid Turbine and the development of the training concepts are at an early stage. Yet, we are carrying out this work via joint working meetings in which different parties are actively engaged. This, to me, is already aq good sign and I am looking for the next steps that are taken very soon.

To be continued …

PS. I have written this blog posting just before a series of working meetings with several LL partners and stakeholders that will bring these issues (and wider issues) further. As I will not be present in all these activities and since I will be travelling some time afterwards, it may take some time before we get updates. PK

Acknowledgements. This work is supported by the European Commission under the FP7 project LAYERS (no. 318209), http://www.learning-layers.eu.

 

Learning Layers – What kind of transition phase are we going through in our fieldwork (Part 2: Participative workshops)

August 25th, 2013 by Pekka Kamarainen

In my introductory statement to this series of blog postings I indicated that we – the ITB team together with our colleagues in Pontydysgu and our are application partner Bau ABC) are  going through a transition phase in our fieldwork. Roughly, this transition can be characterised as a  shift from preparatory measures to active collaboration in participative co-design work. This might seem a bit bold statement but I think this is exactly what we are experiencing at the moment.

Looking back at our workshop reports and my early blog postings on the Learning Layers (LL) project, I see that we were  mapping the grounds for forthcoming pilot activities. During the winter months (before the Design Conference) and the Easter break we had collected quite a lot of interview materials and made several field visits. In this phase we were getting insights into the work of individual company representatives and full-time trainers of Bau ABC. This material was used for the initial User Stories for the Application Partner Days and for the Design Conference of the . In Bremen we tried to group this material into contextual maps – to identify emerging  design ideas. (Later on some of the ITB colleagues have produced summaries of the interviews and coded it with MAXQDA.)

After the Design Conference in March our key question was, how to get the initial design ideas well grounded in the working and learning contexts of our application partners. We felt the need to get a better and wider understanding on the working and learning contexts of apprentices (both at their companies and at the training centre Bau ABC). We also wanted to get a better picture how they were using mobile devices and web technologies – in particular as support for working and learning. For this purpose we firstly organised a conversational workshop and then some storyboard workshops. With the help of these workshops we got more holistic pictures of the working days of apprentices in companies and in Bau ABC. Furthermore, we got a glimpse of some trade-specific problem situations or challenges and ideas, what role mobile technologies, web tools and software solutions may play. Also, some ideas were raised for context-specific apps.

With the trainers of Bau ABC we also had a storyboard exercise to illustrate their working day alongside apprentices’ projects. Then, during later working visits  we have continued to review the results of apprentices’ workshops but on top of that we have had further discussion on the points of intervention for the first year pilot activities. With these discussions we have got more comprehensive picture of needs to facilitate training and learning processes (with the help of digital media and web) and of the limits of current software solutions and web applications. Moreover, in these sessions the colleagues from Bau ABC have increasingly worked as a local LL team with regular cooperation with researchers from ITB and developers from Pontydysgu. (In this context we have also identified some spin-off initiatives for which we need to find additional resources.)

In this way we are reaching thew phase in which the workshops need to include demonstrations of emerging tools, applications and web designs. Then, the workshops could give focused feedback of the usability or shortcomings of the tentative solutions and/or the possibilities to use complementary apps and solutions. This has further implications for the development process, for supporting training activities and for our research agenda.

To be continued …

PS. With this series of blog postings I am focusing more closely on our cooperation with Bau ABC in the context of the Rapid Turbine initiative. This doesn’t imply that our work with our other application partners would have gone quiet. On the contrary – quite a lot of steps forward have been taken by in the fieldwork and design processes of the Captus team that focuses on the ecological construction work (represented by NNB/Agentur in Verden). However, since I have not been present in these events, I am not in the position to give detailed reports. PK

Acknowledgements. This work is supported by the European Commission under the FP7 project LAYERS (no. 318209), http://www.learning-layers.eu.

 

Learning Layers – What kind of transition phase are we going through in our fieldwork (Part 1: Transitions on many fronts)

August 25th, 2013 by Pekka Kamarainen

Quite some time has passed since my latest blog postings on the Learning Layers (LL)  project. This doesn’t mean that the project would have gone quiet or that there would not have been anything interesting going on in the fieldwork. On the contrary – there were a lot of activities going on before the holiday break and the same has been the case after the holiday break. Thus, we (from the ITB team) have had to put a lot of effort to get the events and the activities and events documented with internal notes and reports. At the same time our Pontydysgu colleagues have been busy with development work and with documenting their work processes. (See the recent blog postings on Rapid Turbine and Reflect by Graham Attwell and his colleagues on the Wales-Wide-Web.)

Looking back at the my earlier postings from May and June I see a gradual transition in the way that we have worked. In our workshops and joint meetings with apprentices, company representatives and trainers we were looking for possibilities to launch participative design processes. We were working with storyboards and user journeys, getting insights into critical situations or everyday life innovations in which use of digital media and web can play a role. In the interviews, working meetings and reflection sessions we got feedback on the uses of web tools and applications by professionals in construction sector.  This all has been very valuable for getting a better understanding, how to get participative co-design processes working. (And we are not necessarily saturated with such material yet.)

However, from a certain point on our work started to have other characteristics. The collaboration of ITB, Pontydysgu and Bau ABC started to focus more closely on using digital media and web resources in selected working and learning projects. This was the step forward from the overarching design idea “Sharing Turbine”  – digitalisation of the White Folder (see the earlier blog of Graham) and the related training/learning processes. Whilst this overarching perspective needs to be kept on the agenda, it was necessary to start more focused pilot activities on the ground. For this purpose a particular area of construction work was chosen, – building pipelines for water supply and sewage (Rohrleitungsbau). This initiative was named “Rapid Turbine” to emphasise that it is a quicker pioneering exercise within the larger agenda.

With the following blog postings I try to give some insights into our recent fieldwork activities during the period that we have been working with the Rapid Turbine initiative and with complementary activities. My own impression is that we have been going through a transition from preparatory measures towards a real participative co-design process. Indications of such transition can be seen in our workshops with apprentices and trainers, in the design work itself and in related preparation of training models and in the rethinking of our research agendas in the LL project.

I think this is enough for an opening statement. There are a lot of issues to take up in the forthcoming postings.

To be continued …

Acknowledgements. This work is supported by the European Commission under the FP7 project LAYERS (no. 318209), http://www.learning-layers.eu.

 

Learning Layers – What are we learning in the current phase of our fieldwork? (Part 4: Learning from cluster organisations elsewhere)

June 8th, 2013 by Pekka Kamarainen

In my previous posts in this series I have mainly focused on the efforts of the ITB team and the application partners in North Germany. However, an essential part of the picture of the fieldwork is  the involvement of external partners of the Learning Layers (LL) project who have accompanied our field activities and provided feedback from parallel developments in Europe. In particular we should pay attention to the work of Gilbert Peffer (CIMNE) and Tor-Arne Bellika (I-Perform) who have taken the responsibility to find out as much as possible of European cluster policies and of the functioning of cluster organisations in Europe.

In general, it was refreshing to learn from the functioning and of the services of well-organised cluster organisations elsewher in Europe. In this respect it was interesting to learn of the cross-sectoral cluster region in Upper Austria (Oberösterreich). In a similar way it was important to learn of the specific cluster organisation in ecological construction work in Lower Austria (Niederösterreich). The former example drew attention to new cooperation prospects across accustomed boundaries. The latter example drew attention to new possibilities for knowledge transfer in the context of same area of specialisation.

Also, the work of these ambassadors of knowledge transfer has drawn attention to the fact that it was not only the ‘results’ and organisational´models of ‘mature clusters’ that were important in promoting innovations. It has been very helpful to learn what kinds of services such cluster organisations can provide for their members (e.g. in the context of HRD, talent finding, training, ICT support and logistics). In particular it is important to see that the member organisations are often SMEs who couldn’t provide such services on their own but can benefit of joining forces with each other.

This perspective is very important for the LL project. There are many ways of presenting the results of our design activities and sharing the results as ‘offerings’. As an example, the webinar concept with which we have piloted in Verden, could be developed further as such offering.  Also. there are many ways of engaging users in our development activities. Its was inspiring to find out that the participative co-design workshops of the LL project and the efforts to promote user engagement attract the interest  of cluster organisations elsewhere in Europe.

This all is part of what we are learning in the current phase of our fieldwork.

Acknowledgements. This work is supported by the European Commission under the FP7 project LAYERS (no. 318209), http://www.learning-layers.eu.

Learning Layers – What are we learning in the current phase of our fieldwork? (Part 3: SMEs in craft trade)

June 8th, 2013 by Pekka Kamarainen

My previous post informed of the fieldwork activities that we had arranged with the training centre Bau ABC. In this context the construction companies were addressed in an indirect way – via apprentices who were reflecting on their working and learning experiences in the companies (and looking for new solutions). In this post I shift the emphasis from the training context to cooperation with SMEs – directly or via their network organisation (in this case the NNB/ Agentur).

In the case of Bau ABC we had a relatively easy start with the workshops. It is no major problem for training centres to involve their learners and staff members in such workshops in the course of their normal weekly schedule. However, it requires more effort from SMEs to participate in similar events (either as their own event or as a joint event hosted by trade guild or a networking agency – such as the NNB/ Agentu). Therefore, it has been necessary to find ways to present design ideas of the Learning layers (LL) project for them in such a way that they would see the benefit for them and commit themselves to the necessary preparatory events. Here our colleagues Joanna Burchert and Werner Müller as well as Tobias Funke from NNB/ Agentur have had to work hard to find ways forward. Here some remarks from an observer’s point of view. Joanna and Werner have spent the last week on a course in Verden and deepened their insights in the topic ‘ecological construction work’ and into the community. Thus, they will soon have quite a lot of fresh  first hand information to report.

Shortly after the LL Design Conference Tobias Funke raised the issue that the NNB/Agentur should develop a specific offering – a Webinar – to inform its own staff and member companies of possible uses of web applications and services that could be immediately useful. Werner and Joanna from the ITB team started to work together with this concept and agreed to take the role of trainers (to get themselves into a development-oriented dialogue with the participants). This webinar was thought to be a preparatory step to a presence workshop in which the participants could test the applications and try to customise them for their own context. However, the Webinar turned out to be an internal training event – and as such a useful one – but with no participants from the member SMEs. The planned presence workshop had to be postponed and instead a working session was organised to see how the SMEs could be approached with more targeted and customised offerings.

Without going into details it is worthwhile to mention that in our direct contacts with SMEs we have had somewhat similar experiences. It has not been easy to find an obvious way to open the discussion and design processes on other LL design ideas (although there is much good will). It is becoming clearer to us that the befits that we might be able to demonstrate in optimising work processes may lead to non-trivial issues about redistributing decision-making powers and responsibilities of risks. Thus, well-meant interventions to work processes may have problematic side-effects on the business processes. Furthermore, these issues tend to be perceived in a different light in different companies.

What we tend to see as the way forward is to develop similar exercises as the storyboard workshop in Bau ABC for apprentices and/or skilled workers in interested companies. Here the challenge is harder – the mapping of problems, hurdles and communication gaps in the process of work is though similar but the search for possible solutions may be more demanding in a mini-workshop or individual exercise. Therefore, we see it necessary to continue the interviews with company representatives and the harvesting of existing interview material.

Here, the picture is incomplete and may change soon in the light of newer information. However, the message is the same: our efforts to bring the use of ICT- and web-based tools and apps to the everyday practice of SMEs are not just simple measures of introducing new tools for those who are interested. The processes of accessing information, sharing knowledge and managing communication are very closely linked to business processes and to (re)distributing roles, powers and responsibilities. The SMEs need to get convinced that it is worthwhile taking the path that brings changes alongside developmental steps. We need to work and learn with the SMEs to see the benefits together with them.

To be continued …

Acknowledgements. This work is supported by the European Commission under the FP7 project LAYERS (no. 318209), http://www.learning-layers.eu.

Learning Layers – What are we learning in the current phase of our fieldwork? (Part 2: Bau ABC)

June 8th, 2013 by Pekka Kamarainen

In my previous post I indicated that our current phase of fieldwork is preparing the grounds for participative co-design processes “for the users, with the users and by the users”. So far, we have had quite a lot of activities with the training centre Bau ABC and made also a lot of experiences with different workshops. Here, the blessing for us has been that we have had a chance to have joint workshops with groups of apprentices (during their stay at the centre) and with full-time trainers (at the time slots when apprentices have been working independently with their projects). Below some remarks on our workshops and on our learning experiences about their ways of making the workshops their events in which they address their own issues, concerns and initiatives.

Firstly, on the workshop concepts with which we worked: We firstly had conversational workshops with one group of apprentices (from different trades) in the morning and with a group of full-time trainers (Lehrwerkmeister) in the initial training plus the coordinator of continuing vocational training programmes. These workshops were supported by some pre-given guiding questions (Leitfragen) but they were run as relatively free conversation to let the participants address their issues with their own accents and their own voice. As a result, the apprentices spoke very freely of what they saw a needs and possibilities for improvement regarding the training in the centre (vis-a-vis advanced practice in the companies). They also emphasised their interest to have joint projects with apprentices from  neighbouring trades. The trainers gave positive comments on the views expressed by apprentices – however, they drew attention to rather inflexible boundary conditions for accommodating the apprentices’ training periods in the centre. Thus, there is very little room for manoeuvre for meeting the wishes of apprentices re joint projects or more flexible timing of periods in companies and in the centre. In addition, the trainers started giving thoughts, how they could use digital media and web appsa more effectively in informing themselves of new developments in the trade and on advanced practice in companies. Here, it seemed that something that was discussed in initial training was already in practice in the continuing vocational training activities.

In the next phase we organised a storyboard workshop that was based on group work to make storyboards of exemplary working days of apprentices (in the morning) and trainers (in the afternoon). The two parallel groups of apprentices had different tasks: one was invited to portray a day in the training centre whilst the other was asked to portray a day in the company and in the construction site. The group that worked with a day in the centre presented a spatial journey with drawings of different locations  at the Bau ABC sites and only after completing this started to give thoughts on eventual problems and how they could be taken into account in the phase of giving instructions. The group that focused on working at construction site portrayed the work flow (and the daily journey) from the company office to the site, setting the site and carrying through the process (drilling the holes for the well to be built) and in completing the task. Here, the apprentices drew attention to eventual obstacles and needs to star again or to give up if no water is found. Thus, they highlighted key problems in the work process – in which however the availability of web tools made very little difference. At the end of this session the joint plenary discussion started top trigger ideas of new apps to extend the learning effect and to draw attention to good practice  (e.g. the Maurer-App) and comments on the (limited) usability of existing apps.

The trainers gave very positive comments on the storyboards of apprentices and gave some thoughts of the possible usability of existing apps as a basis for the proposed Maurer-App. In their own group work phase they presented two parallel storyboards of trainers work at the centre. One story focused on a relatively homogeneous group of apprentices in the initial training whilst the other illustrated the growing complexity when there are apprentices from different phases of their training and eventual visiting groups in continuing training (with visiting trainers) to be supported at the same time. Altogether, the storyboards drew much more attention to the complex social and organisational processes to be managed alongside the key training functions  (instruction, supervision, monitoring, assessing and giving feedback). In the plenary sessions a lot of thoughts were given on the possibilities to offload the trainers with digital solutions in the assessment and in giving feedback. A major issue was the access to norms, standards and regulations in which context new copyright problems had emerged. As a result, a list of several design ideas and issues was drafted to be included into the workshop report (to take into account the issues arising from initial and continuing training).

Here I have emphasised the workshop dynamics rather than particular ‘results’ to be listed as apps or solutions that would have attracted most attention. In the preparation phase our colleagues suggested different techniques to get feedback on particular ‘use cases’ or wireframes drafted on the drawing boards elsewhere. As I have illustrated it above, when the users got control of their workshops, they addressed concerns, how to improve their working and learning processes on the whole. When getting their messages into discussion we then could use  some time to illustrate some of the use cases and emerging wireframes as possible responses to their concerns. In this context the powerpoint slides and the presentation of Martin Bachl (Hochschule Karlsruhe) worked very well.

As I understand it, we are going through similar collaborative learning processes as the earlier Work and Technology projects that couldn’t successfully transplant new technologies into companies as ‘gifts that fall  from Mt Olympus that are parachuted upon users’ but had to discover the possible needs for innovations and benefits for users in iterative processes that took their own time. Yet, after these experiences we have the feeling the we are making progress.

To be continued …

Acknowledgements. This work is supported by the European Commission under the FP7 project LAYERS (no. 318209), http://www.learning-layers.eu.

Learning Layers – What are we learning in the current phase of our fieldwork? (Part 1)

June 8th, 2013 by Pekka Kamarainen

I see that I have been out of writing blogs on the Learning Layers project quite some time – the previous ones are from April and March. I hope that no one gets the false impression that this would have been a sleepy period in the project. To be sure – it is exactly the other way round. Now, after the first Design Conference and after the Easter break the ITB team, the application partners in North Germany and our supporting partners have been busily engaged in organising Co-Design Workshops or supporting events and in doing their homework with design ideas, relevant web tools and apps as well as drafting use cases and wireframes.

In this context the role of the ITB team has been to work as “explorers on the ground” in the terrains of our application partners (the training centre grounds of Bau ABC, the headquarters of the network/Agentur for ecological construction work  and the offices of craft trade companies (SMEs) in the construction sector. The previous phase of fieldwork was characterised by collecting data of potential users of ICT/Web-based tools and apps – and of exemplary situations in which they could be of some help. Now, the present phase of fieldwork is characterised by a clear step to participative design work – for the users, with the users and by the users.

Here we have encountered different sets of possibilities (and also hurdles) when working together with our application partners (Bau ABC, NNB/Agentur and individual craft trade companies). We have written quite a lot of this in the internal working documents with which we update ourselves and our LL partners of the activities. We have also learned a lot of the visits of other LL partners who have accompanied us to the field activities. Some of such ‘lessons learned’ have also found their way to these working documents.

In the light of the above it is understandable that the motto of this series of blogs is not “what have we learned” (= results) but “what are we learning” (= insights to be considered carefully). This is all work in progress and – for us: learning alongside working in the project. Also, in many respects, the lessons that we are learning, are not completely new – they are similar lessons as were learned in earlier innovation projects for Work and Technology (Arbeit und Technik) programmes in the late 1980s and in the 1990s. Apparently, some of these lessons have to be learned anew every time in newer innovation contexts.

To be continued …

Acknowledgements. This work is supported by the European Commission under the FP7 project LAYERS (no. 318209), http://www.learning-layers.eu.

 

Learning Layers – Socio-technical fantasy and learning in everday life situations (Part 2)

April 17th, 2013 by Pekka Kamarainen

In my introductory post I told how I was pushed to write a series of blog posts about the value of learning from everyday life situations in different work organisations (including our own ones). This was posed as a challenge for the research partners and technical partners of the Learning Layers (LL) project. After some hesitation I got the point and came to the motto “Socio-technical fantasy and learning in everyday life situations”. (I owe much to C. Wright Mills and to Oskar Negt.)

Here, I want to report of a strange story that we experienced when we here at ITB (Bremen) tried to complete some administrative duties for the LL project and for that purpose sent a letter quickly to CIMNE (Barcelona).  This is how the story went on:

1. Episode: We had to provide documents with  signatures of the authorised persons of the University of Bremen and to send them by post (not only as scanned copies) to CIMNE. We were among the first to obtain the signatures and were ready to send the letter long before the end of November. I was about to engage a courier service (DHL) but colleagues from our administration convinced my that DHL is only the other part of the German post and that a registered letter would be delivered just as quickly.

2. Episode: One week passes and another week has started and the letter has not arrived in CIMNE. Most of the other partners have sent their ones and we are in the rearguard. The web monitoring service of the German post only tells us that the letter has been delivered to a foreign partner. The website of the Spanish post could not inform of the adventure of the letter. So, since we got concerned, we sent an official inquiry to the German post (date 30.11.2012) to find out, what had happened to the letter. We received an automated answer that the German post will promptly examine, what has been the cause of the delay and inform us asap.

3. Episode: Immediately after sending the inquiry we received the good news that the letter had reached CIMNE and that the finalisation of main contract between European Commission and CIMNE could be completed immediately. So, the big problem was no longer there. Nevertheless, we wanted to keep the inquiry going on to find out what had happened (and to see how it will be explained to us).

4. Episode: Just before the Easter holidays we get an official letter from the German post (dated 18.3.2013)  informing that the letter has unfortunately not been delivered to the recipient (CIMNE). There is no explanation what might have happened. Instead, there is a helpful advice, what to do to get a compensation for eventual damage.

Concerning our theme, “learning from everyday life situations in work organisations” we can draw several lessons and locate them on different levels (or – if you insist –  layers):

a. Lessons learned by the individuals involved: We at ITB have drawn our own conclusions on the question, which means of delivery we can rely on in our international correspondence. We also noticed the limits of the web-based monitoring services.

b. Lessons learned at the level of ‘knowledge sharing’ in the organisation: At the moment this story is being shared as a joke that is being told to colleagues as a part of informal chatting. However, there is a far more important lesson that needs to be learned across the organisation. This time a threatening problem situation was avoided but one should be prepared.

c. Lessons learned at the level of ‘knowledge sharing’ in a wider international community: Looking at this story from a wider international perspective, it is again one of those stories of things that have gone (almost) wrong because of practicalities (like sending the letter securely). In some cases huge consortia have lost the chance to submit bids because letters of commitment have not reached the coordinators in due time. This raises a question, whether someone should create a knowledge sharing tool (“Erfahrungssammler”) to raise awareness of such problems and to give recommendations for appropriate practice.  …

I stop my story here before the fantasy carries us too far away from the realities of everyday life. Of course I have put a bit of exaggeration into  my last point. Indeed, it is easy to try to push others to examine their everyday life situations (with the hope that they find the episodes as stimulus for learning). It is a bit more difficult to get inspired of one’s own experiences with everyday life situations as described above. However, this is the motivational hurdle that the LL project and the partners try to overcome.

Acknowledgements. This work is supported by the European Commission under the FP7 project LAYERS (no. 318209), http://www.learning-layers.eu.

 

  • Search Pontydysgu.org

    Social Media




    News Bites

    Cyborg patented?

    Forbes reports that Microsoft has obtained a patent for a “conversational chatbot of a specific person” created from images, recordings, participation in social networks, emails, letters, etc., coupled with the possible generation of a 2D or 3D model of the person.


    Racial bias in algorithms

    From the UK Open Data Institute’s Week in Data newsletter

    This week, Twitter apologised for racial bias within its image-cropping algorithm. The feature is designed to automatically crop images to highlight focal points – including faces. But, Twitter users discovered that, in practice, white faces were focused on, and black faces were cropped out. And, Twitter isn’t the only platform struggling with its algorithm – YouTube has also announced plans to bring back higher levels of human moderation for removing content, after its AI-centred approach resulted in over-censorship, with videos being removed at far higher rates than with human moderators.


    Gap between rich and poor university students widest for 12 years

    Via The Canary.

    The gap between poor students and their more affluent peers attending university has widened to its largest point for 12 years, according to data published by the Department for Education (DfE).

    Better-off pupils are significantly more likely to go to university than their more disadvantaged peers. And the gap between the two groups – 18.8 percentage points – is the widest it’s been since 2006/07.

    The latest statistics show that 26.3% of pupils eligible for FSMs went on to university in 2018/19, compared with 45.1% of those who did not receive free meals. Only 12.7% of white British males who were eligible for FSMs went to university by the age of 19. The progression rate has fallen slightly for the first time since 2011/12, according to the DfE analysis.


    Quality Training

    From Raconteur. A recent report by global learning consultancy Kineo examined the learning intentions of 8,000 employees across 13 different industries. It found a huge gap between the quality of training offered and the needs of employees. Of those surveyed, 85 per cent said they , with only 16 per cent of employees finding the learning programmes offered by their employers effective.


    Other Pontydysgu Spaces

    • Pontydysgu on the Web

      pbwiki
      Our Wikispace for teaching and learning
      Sounds of the Bazaar Radio LIVE
      Join our Sounds of the Bazaar Facebook goup. Just click on the logo above.

      We will be at Online Educa Berlin 2015. See the info above. The stream URL to play in your application is Stream URL or go to our new stream webpage here SoB Stream Page.

  • Twitter

  • Recent Posts

  • Archives

  • Meta

  • Categories