Learning Layers – How do we take our “lessons learned” with us to design activities? (Part 1)

February 28th, 2013 by Pekka Kamarainen

So far the Learning Layers (LL) project has been working with initial interviews, drafting user stories and with field visits that validate the picture – the Application Partner Days (see my prvious posts). Now it is time to take further steps to design activities. The opening event will be the Design Conference in Helsinki next week.

The LL teams of ITB and Pontydysgu have prepared this step with reviewing the material that has been used for the user stories that focus on construction sector. We have tried to put the individual cases into wider contexts and look, how particular design ideas would meet the needs and interests emerging from these wider contexts.

In the first phase we have done some contextual mapping to identify sets of working and learning contexts (Entwicklungszusammenhänge) that are not necessarily visible in individual user stories but become transparent when you construct a group picture of several stories and exemplary situations. Below I give some insights into working  issues and challenges that arise from such wider contexts:

 a) Contexts of induction, counselling and further qualifying: When studying the stories from ecological construction work, we have noted that the leading organisations have to take wide responsibilities in the induction and further qualifying of the new staff. In the same way they have to act as counsellors and advisors of new crft trade companies that want to speacialise in this field. The lack of institutions and resources in research and (higher) education and training requires more efforts from actors in the field. This is a major challenge for mentoring, tutoring and continuing professional development. Here, we have several design issues coming up regarding the use of web.

b) Contexts of sharing information and knowledge – from particular construction sites to wider forums: Other exemplary stories have drawn our attention to rather simple gaps of communication and to limited access to (digital) documents at construction sites. This may cause problems between planners and skilled workers who carry out the tasks. Whilst these could be helped with simple applications, our partners have warned us that knowledge development may not be a matter of collecting experience from individual cases. One of the challenges in ecological construction work is to clarfy, which solutions may be appropriate for certain sets of cases and inappropriate for others. Such level of knowledge sharing and mutual critique requires forums that are characterised by mutual trust and commitment to common cause. Here again, we have several design issues coming up.

c) Contexts that require new information and solutions for making learning gains available for further use: Some of the user stories gave examples of problem situations in which new information was needed on new materials or new regulations for special installations. In such cases the craft trade companies had to carry out searches and to make the results available across the company. In some cases there appeared to be a general pattern that could be identified and made available for a more generals service across companies (e.g. by training organisations or by joint associations or umbrella organisations). Here we see design issues and questions on responsibility for joint services.

 d) Specific challenges in the field of borehole-drilling and well-building: The field of borehole-drilling and well-building (Brunnenbau bzw. Spezialtiefbau) is characterised by specific risks both regarding health and safety and regarding possible damages caused for the environment and materials. Therefore, the industries are engaged in developing applications and web services. Yet, the examples reflected in user stories and APD workshops show that there are possible gaps and needs for double-chacking (that require attention from the craftsmen). Another aspect is that the health and safety traininf is very well regulated but follows a traditional pattern. Therefore, use of web services and new media could enhance the training and the required health and safety awareness. Here again, we see several design issues coming up – linked to the question of responsibilities and conformity with given regulations.

These remarks give insights into the challenges that the LL project is facing in the next step. In my next posts I try give some answers, how the challenges could be responded by our work with design ideas and with the developmental strategies that our application partners have brought into discussion.

To be continued …

Acknowledgements. This work is supported by the European Commission under the FP7 project LAYERS (no. 318209), http://www.learning-layers.eu.

Learning Layers – What have we learned during Application Partner Days in Bremen (Part 4)

February 1st, 2013 by Pekka Kamarainen

I hereby complete my reporting on the Application Partner Days (APDs) of the Learning Layers (LL) project that were organised this week in Bremen and in the neighbouring areas. My two previous posts gave an overview on the site visits to the training centre area of Bau ABC (Rostrup) and to the premises of Agentur für nachhaltiges Bauen (Verden). I also reported on the workshop events that were organised in the context of these site visits. This blog article focuses on the issues that were raised and observations that were made during the talks in these workshops. As the digestion of  the rich documented material will take some time, I only want to provide a bridging step to further analyses and conclusions.

Below I will sum up some issues and remarks across the discussions during both on-site visits:

1. Who were the ‘users’ whom we met and/or whose interests and problems were discussed?

At the Bau ABC the ITB team members had earlier met senior trainers (Lehrwerkmeister) of the Bau ABC staff and got some of their views documented in the “User stories”. Now these persons were already ‘old acquaintances’ when participating in the event. However, this time there was an opportunity to widen the circle and to engage several senior craftsmen who were completing their continuing training to become certified team leaders/on-site supervisors (Werkpolierer). In a similar way the spectrum of trades was widened to cover different fields of construction work (including the building of houses, construction of roads and the special construction areas of borehole builders).

At the Agentur the ITB team had mainly talked with architects and on the core activities of the Agentur and the supporting network on ecological construction work. Now the workshops set the accent to outreach activities towards craft trade companies (represented by two entrepreneurs) and to apprentices (discussed as a major target group for the forthcoming  exhibition).

 2. What kinds of problems and challenges brought ICT and Web into picture?

On both site visits the discussion was triggered by coordination problems and communication problems at different construction sites. Various examples were presented of gaps of information, gaps of communication, lack of shared information and hurdles in knowledge sharing. Much of this could be helped with simple apps (which were also becoming widely used), some problems appeared to be more deeply rooted into divisions of labour, hierarchies and to cultural boundaries between different trades and companies involved.

3. How are these issues related to learning and knowledge development?

Firstly,  some of discussions might have seemed to be somewhat remote of the theme “learning”. However, in a closer analysis it is possible to discover different instances of learning or instances of professional development when the construction specialists addressed needs for ICT and web support (or proposed possible solutions). Here, it was possible to observe a movement from passive expectations to participative co-development and co-design.

Secondly, it is worthwhile to consider, to what extent is use of web and digital media embedded into the working and learning culture of construction sector. At the moment some of the main documentation is still paper-based and the transition is only taking place (e.g. the apprentices white folders are paper-based and some of the software solutions for planners have not really made a breakthrough). Here, issues of trust and practical benefit are very present.

Thirdly, it is worthwhile to consider the cooperation culture at the construction sites and between different parties involved. The traditional mode of thinking and working emphasised the division of labour (each party being responsible of their task) whilst nowadays new holistic solutions (package offers) may change the picture.

4. What can be considered as “hot issues” or factors that keep the discussion going on?

 Firstly, it is obvious that the construction industry and trade want to attract new workforce and to influence the public image of construction work as low-tech area. Secondly, in many special areas the high risks with costly equipment require more attention to risk management by different parties. Thirdly, trainers have a major concern in improving the quality of training in safety issues and to raise awareness of safety risks (e.g. using video simulations and intelligent games). Fourthly, young professionals who are working their way through via vocational progression routes are interested in acting as change agents (and in being recognised as such).

After all these remarks I find it appropriate to bring my reporting to an end at this point. As I mentioned above, I am not suggesting any conclusions for the LL project but making some remarks that help us to step to the next phase of work.

The discussion will be continued …

Acknowledgements. This work is supported by the European Commission under the FP7 project LAYERS (no. 318209), http://www.learning-layers.eu.

Learning Layers – What have we learned during Application Partner Days in Bremen (Part 3)

January 31st, 2013 by Pekka Kamarainen

I am continuing my reports of field visits that took place this week as a part of the Application Partner Days (APDs) of the Learning Layers (LL) project. This blog article focuses on the visit to the premises  of Agentur für Nachhaltiges Bauen and its sister organisations in Verden (South-East of Bremen).

As we have been informed in the project, the Agentur is part of an organisational grouping that is based in Verden and has formed a joint network to promote ecological (sustainable) construction work. Currently this grouping runs an activity centre (Ökozentrum) which provides room for craft trade companies, architect office and joint training facilities. In the year 2014 the network will have a major exhibition building that is currently under construction. The initial buildings were originally used by the German army and they have been reshaped and repurposed for training activities. The new buildings are already demonstration cases for using strawball material for constructing walls. The exhibition building is a demonstration case for wood construction with five storeys.

After a tour round the premises the hosts brought us to a seminar room and organised a major ‘carousel’ workshop. The participants were allocated to four topic tables in which a network member (or two) took the role of hosting the discussion. Each group had a large sheet of paper to make notes (or to add to the notes of the previous group) and sticker dots to mark priority areas for further discussion. After 25 minutes the groups rotated between the hosts. Altogether we managed to complete three sessions in each topic table.

The topic tables were based on the following issues:

  • Meister Manfred (Entrepreneur in carpentry and woodwork) hosted a topic table in which he informed of the development of an iPad app for his company to inform their cost calculation program of the time needed for specific jobs at the construction site. This input (supported by a parallel case of another entrepreneur) triggered a discussion on other uses of iPad (or other tablet PCs) at construction sites.
  • Architect Enno (Director of the Agentur and co-founder of the network) hosted a table in which he informed of everday life experiences about lack of knowledge sharing between contractors (entrepreneurs) and their staff (craftsmen who do the job). This input (supported by the visualisation of the user story) triggered a discussion on simple applications that would be helpful to overcome such gaps of communication.
  • Architect Ute (Member of the network) hosted a table in which she informed of the plans for the opening exhibition during the inauguration of the new building. The idea is to provide a “learning exhibition” that makes good use of live experience on site, of effective web demonstrations and active contact with different target groups (to serve them better on site and via web). This input triggered a discussion of  various groups and different needs or interests to be catered for.
  • Project managers Melanie (Bau ABC) and Tobias (Agentur) hosted a table in which they facilitated discussion on knowledge sharing, collaboration and networking in craft trades. They presented inputs on different regions and on different groupings with which they have cooperated. These triggered a discussion on factors that restrict or increase willingness to cooperation (“business as usual” or “competitive advantage with holistic solutions”).

After three rotations the carousel was finished with a brief plenary that had to be stopped abruptly because of time constraints. Yet, the discussions were kicked alive and the issues were there.

To be continued …

Acknowledgements. This work is supported by the European Commission under the FP7 project LAYERS (no. 318209), http://www.learning-layers.eu.

Learning Layers – What have we learned during Application Partner Days in Bremen (Part 2)

January 31st, 2013 by Pekka Kamarainen

As I mentioned in my previous post, I am preparing brief reports of field visits that took place this week as a part of the Application Partner Days (APDs) of the Learning Layers (LL) project. This blog article focuses on the visit to the training centre area of Bau ABC in Rostrup (West of Bremen).

As we have been informed in the project, Bau ABC is one of the two major training centres set up by the umbrella organisation of building and construction sector in North Germany (Bauindustrieverband Niedersachsen-Bremen) and it is run as an operative arm of a support association for training in building and construction sector (Verein zur Berufsförderung der Bauwirtschaft Nord e.V.). The training centre Bau ABC in the municipality of Rostrup covers a wide range of occupational fields including initial VET (Erstausbildung), continuing training (Weiterbildung), training of Master Craftsmen (Meisterschulung) and other measures to support professional development of construction specialists.

During our tour round the premises of Bau ABC we had the chance to look firstly at the workshops of carpenters (Zimmerer), concrete builders (Betonbauer), and metal workers (Metaller). In  outdoor areas we saw the training sites for groundwork builders (Erdebauer),  road builders (Strassenbauer) and borehole builders (Brunnenbauer). Then, in the next workshops we had a chance to inform ourselves more of the training of borehole builders (Brunnenbauer) and of bricklayers (Maurer). Finally we saw the special areas for security training with focus on occupational hazards that are related to explosions.

The afternoon program of the visit consisted of two parallel sessions. One session was organised as a Focus Group involving some of the research partners and a number of trainers (Lehrwerkmeister) and participants in advanced training programs from Bau ABC. This group focused on the User Stories and tried to get further insights into workplace learning and uses of new technologies. Parallel to this session there was a small ‘carousel’ workshop in which some of the technical partners hosted small tables and participants from construction sector rotated between the tables.

The technical partner teams  (Graz, Tribal, Aalto and Karlsruhe/Pontydysgu) had made their own preparations for a dialogue session. Bau ABC had provided exemplars of apprentices’ and trainees’ working and learning tasks. Based on these inputs (and on some use stories) the technical partners informed themselves of problems or challenges in construction work and workplace learning. Then the discussion geared towards looking for possible solutions – uses of technology, uses of software and uses of networks and web resources.

At the end of the day all participants had experienced manifold discussions and the participants from Bau ABC had done their best to feed in inputs, ideas and experiences. So, there was much food for thought to be digested.

To be continued …

 

Learning Layers – What have we learned during Application Partner Days in Bremen (Part 1)

January 31st, 2013 by Pekka Kamarainen

My previous posts on the Learning Layers (LL) project raised the question: “What can we learn during on-site-visits?” At that time the ITB team was busy doing interviews with application partners from the North German construction sector. The first results were rapidly prepared as draft User Stories for further analyses. In this context the quick blog articles served as ‘appetizers’ for other partners: “Here is your chance for a sneak preview before live visits.”

Earlier this week a considerable number of LL partners were visiting the training centre area of Bau ABC in Rostrup and the premises of Agentur für Nachhaltiges Bauen and its sister organisations in Verden. The visitors had prepared themselves with the help of the User Stories and the hosts had taken initiatives to bring the discussion further. So, after this shared experience it is appropriate to ask: “What have we learned during the Application Partner Days?” Obviously, this general question paves the way for a number of more detailed questions. Most of these require a closer look at the videos recorded during the sessions and at the sheets filled with notes and dots during the workshop sessions.

Therefore, I am not trying to wrap up all and everything that was learned in Bremen and in the nearby areas on the two Application Partner Days  dedicated to construction sector. Instead, with the two subsequent blog articles I to give an impression of the events that were organised and of the discussions in parallel sessions. I will also outline some questions that help us to digest the impressions on workplace learning, use of (learning) technologies and of knowledge development in construction trade. I then insert some remarks that arise from the joint discussion of the ITB team after the event. I hope these preliminary remarks help to bring our joint work further.

To be continued …

Acknowledgements. This work is supported by the European Commission under the FP7 project LAYERS (no. 318209), http://www.learning-layers.eu.

Learning Layers – What can we learn during on-site visits? (Part 2)

January 16th, 2013 by Pekka Kamarainen

In December 2012 I started a series of blogs for the Learning Layers (LL) project with the question “What can we learned during on-site-visits. In the first article I summarised my first impressions from a field visit of the ITB team to the work site of our partner organisation Agentur für Nachhaltiges Bauen. This visit (and the interviews we recorded) gave us a much richer picture of the special area ‘ecological construction work’ and of the innovations that our partners are pushing ahead in this field.

Now, in January 2013, the ITB team has started its work for LL with further field visits (including audio/video recorded interviews) to the sites of our partners in the North-German construction cluster. Yesterday I and my colleague Werner Müller visited the training centre BauABC Rostrup at Bad Zwischenahn (near Bremen). During our visit we had a quick look at some of the worksites and training workshops and carried out five interviews with seven counterparts.

It is worthwhile to emphasise that Bau ABC Rostrup is not whatever training centre in the construction sector in Germany. It has been launched by the central organisation of the construction industries and employers (Bauindustrieverband) of the federal states Bremen and Niedersachsen and it provides training services across North Germany. In some areas (see below) it serves as a nation-wide centre of expertise. In the initial vocational training serves primarily as an inter-enterprise training interface (überbetriebliche Ausbildungsstätte) that caters for such training blocks that cannot be provided by individual companies. In the continuing vocational training it is in charge of continuing professional development of skilled workers and of training for master craftsmen (Meister) and other specialists in the trade. Due to these training functions Bau ABC has in addition to its training rooms or workshops huge outdoor worksites on which different machines, equipments and construction techniques are piloted for training and development purposes. Moreover, the centre is all the time running real construction sites to convert old army warehouses into modern training facilities (designed by Bau ABC staff and built by their trainees).

Without going into details of the interviews and the points that were made, it is worthwhile to raise some points that help the other LL partners to consider, how they can best support the work of application partners – such as Bau ABC.  In this context I would like to draw attention to the following points:

1) Who are our counterparts and what is their role in the construction sector?  Firstly, we had a chance to talk with two senior Master Craftsmen (Meister) in the borehole building (Brunnenbauer). They were in charge of a whole range training activities – including initial vocational training and the trainings for advanced specialist (e.g. the training for new Meister). They were also involved in producing new learning materials and in examination boards. Then, we had a chance to discuss with two apprentices in the same trade. One of them took his apprentice training as a part of his medium-term contract for the German arm. The other one had taken this training after having had firstly a training in other trade (electrician). Finally, we had discussions with three younger master Craftsmen (Meister) who were in charge of initial vocational training for neighbouring occupational areas (bricklayers, carpenters, road-builders).

2) What kinds of occupational areas are covered by Bau ABC and how can they be linked to the LL project? A major occupational area for Bau ABC is that of borehole builders (Brunnenbauer) and groundwork constructors (Spezialtiefbauer). This trade is characterised by costly machinery and equipment and by high risks regarding the treatment of different geological layers and ground water sources. (Work in this trade has been documented by the German army with the Youtube video Wasser für Marmal.) In Germany there are not many training providers for this trade and among them Bau ABC is considered as a national centre of expertise. In the immdediate vicinity there are training facilities and work sites for the neighbouring trades, such as road-builders (Strassenbauer), bricklayers (Maurer) and carpenters (Zimmerer), who also need to have the know-how on laying the foundation of the buildings and for underground construction work.

3) What can be said about the penetration of ICT and Web technologies to different areas of construction work?  In this context it is worthwhile to make a distinction between the borehole builders (Brunnenbauer) and the more traditional crafts and trades. For the borehole builders the industries that produce their machines and are already intensively involved in the  development of ICT equipment and software. Therefore, the exhibitions of this trade are also characterised by the presence of web services and applications. In this respect the more traditional trades have adopted the use of smartphones and tablet PCs at a later date. Altogether, all of the said areas are making new experiences with the usability of ICT- and Web-based tools, apps and services.

4) What can be said of  the readiness of our counterparts to work with ICT, Web technologies and social media?  In general our counterparts were positive about testing and trying out new solutions (“Was man nutzen kann, soll auch benutzt werden.“) However, depending on their positions, training responsibilities and occupational areas the counterparts raised different issues. For some areas work the problems at worksite opened more opportunities for self-directed search for solutions (and on-site learning) whilst for other areas such problems need to be communicated further to external persons with specific responsibilities. This may reduce the range of skilled workers’ involvement in finding solutions. Yet, there were issues about taking note of different problem cases for the continuing training of specialists and of Master Craftsmen (Meister) – who complete their training programmes with practical examinations on real worksites.

Altogether, the visit and the interview sessions can be seen as  preliminary discussions that helped our counterparts to present their first situation assessment on problem-based learning opportunities in their trade and on the role of ICT- and web-based tools in making themselves aware of such learning. In this respect our counterparts are looking forward to further encounters with the Learning Layers project (e.g. the forthcoming Application Partner Days).

To be continued …

Acknowledgements. This work is supported by the European Commission under the FP7 project LAYERS (no. 318209), http://www.learning-layers.eu.

 

 

 

Learning Layers – Learning lessons from prior projects – part 2

December 10th, 2012 by Pekka Kamarainen

My previous posting for this blog (with reference to the Learning Layers project) dealt with the issue “Lessons from prior projects”. I drew attention to several video interviews that I had prepared for another European cooperation project (Coop-PBL in VET). My colleagues in the learning Layers project might consider that the material might be a bit remote to the ongoing project and to the current working issues – maybe, maybe not.

With this post I want to draw attention to the work of an immediate predecessor of the Learning Layers project as regards the work with the German construction sector. The German project Vila-b (Virtual learning in construction work) explored the usability of mobile devices in the context of continuing training for construction workers. The video interviews with researcher Sven Schulte (ITB) make transparent the project concept and users’ acceptance of new media.

In the first video Sven tells about the approach of Vila-b, of the measures to ensure user engagement and of the conclusions, how to make such projects relevant for users.

http://vimeo.com/55277044

In the second video Sven tells about the challenges for getting construction workers interested in using web support. He also draws attention to progress that has been made in the meantime with technologies (e.g. smartphones) and software (e.g. apps). His main point is that active mentoring at workplace has been crucial for supporting workplace learning (in general) and the use of web-based support.

http://vimeo.com/55277043

With these videos I hope to bring  the lessons from prior activities closer to our ongoing discussions on current challenges and tasks.

To be continued … 

Acknowledgements. This work is supported by the European Commission under the FP7 project LAYERS (no. 318209), http://www.learning-layers.eu.

 

Learning Layers – Insights into the views of (individual) users

November 21st, 2012 by Pekka Kamarainen

Graham Attwell has already reported of the kick-off meeting of the EU FP7 project “Learning layers” in his blog article “The Learning Layers project scales up informal learning at the workplace” on the Wales-Wide web.  Graham gave an overview on the key issues and presented several views of partners with different roles in the project.

My intention is to continue the discussion on the Learning Layers project with further insights into users’ interests and expectations. ITB (Institut Technik & Bildung) is involved in this project as a research partner with focus on promoting learning in organisational contexts. In particular ITB has the task to facilitate cooperation with partner enterprises in construction industry and related trades. At the same time ITB has a keen interest to study work process -oriented learning within the networks and communities of medical doctors (General Practitioners – GP).

During the preparation of the proposal the ITB team and the partners from Leeds produced quick video interviews to illustrate potential users’ needs, ideas and expectations regarding the work of the project and possible benefits. Here I would like to draw attention to the parallities between the users’ statements.

In the video produced in Leeds John Sandars presented a user’s story from the GP point of view. He referred to the complex prolems he has encountered in his work as GP with patients that each have a unique set of health problems. For GP it is vital to make quick but well-informed diagnoses. For this purpose it is of little help to overload the GPs with access to massive documents or guidelines. Instead, GPs are more interested in being able to share their notes on individual cases and get feedback of their fellow colleagues (taking into account the confidentiality and the need to anonymise the data). In this way the Learning Layers project is expected to provide facilities to store, share and enrich the work process knowledge that is generated by GPs in their work processes. Moreover, regarding the GPs’ obligations to provide evidence of their professional development (for the revalidation processes), the project can provide a cumulative knowledge resource for the individual doctor, for the GP practice and for the network of GPs.

In the video produced by the ITB team the director of an electric installation company and the head of the trade’s guild (Elektroinnung), Mr Siever makes similar points on the needs and expectations to support workplace learning in his trade. He also referred to the work situation of a technician doing repair or maintenance work with very little information of a problem and with little help of standard manuals or massive handbooks. In such situations (when the client is impatiently waiting for solution) the most likely option is phone call to colleague or to the boss (if they happen to be available). Moreover, if the problem is successfully solved, this may be documented by snapshots with mobile phone camera and some notes. Such storage and sharing of work process knowledge is very fragile and hardly leads to knowledge development. Therefore Siever was  in favour of a living system for documenting problems, key information and possible solutions in the way they have been encountered, tested and documented in critical work situations.

To me it has been striking that the videos that have been recorded in different countries, with different languages and with focus on different professions/occupations have raised similar points regarding the problem-relevance and usability of knowledge from the perspective of practitioners. for both kinds of user stories the emphasis is on the ‘living system’ of knowledge resources.

However, these were the opening statements. The story goes on …

Working & Learning back in Picture with the Learning Layers Project

November 16th, 2012 by Pekka Kamarainen

The Working & Learning blog is now actively contributing to the start of the Learning Layers project (EU FP7). In the forthcoming posts there will be insights into the Learning Layers projects and into the tasks we (ITB and other partners) are carrying out to support workplace learning, work processes and professional development with the help of web applications, services and learning technologies.

However, in order to get new insights there is also a need to look back what has been achieved with prior (European and country-specific) knowledge development. So, there is a need to keep lessons from the past in picture while looking for new findings. Let us see what we find while we are working and learning in the new project …

Opportunities and challenges presented by the fast-changing pace of technology

May 8th, 2011 by Cristina Costa

Last week I took part in a JISC event where participants were asked to have an active role and share their thoughts about “how institutions can and should respond to the opportunities and challenges presented by the fast-changing pace of … Continue reading

  • Search Pontydysgu.org

    Social Media




    News Bites

    Cyborg patented?

    Forbes reports that Microsoft has obtained a patent for a “conversational chatbot of a specific person” created from images, recordings, participation in social networks, emails, letters, etc., coupled with the possible generation of a 2D or 3D model of the person.


    Racial bias in algorithms

    From the UK Open Data Institute’s Week in Data newsletter

    This week, Twitter apologised for racial bias within its image-cropping algorithm. The feature is designed to automatically crop images to highlight focal points – including faces. But, Twitter users discovered that, in practice, white faces were focused on, and black faces were cropped out. And, Twitter isn’t the only platform struggling with its algorithm – YouTube has also announced plans to bring back higher levels of human moderation for removing content, after its AI-centred approach resulted in over-censorship, with videos being removed at far higher rates than with human moderators.


    Gap between rich and poor university students widest for 12 years

    Via The Canary.

    The gap between poor students and their more affluent peers attending university has widened to its largest point for 12 years, according to data published by the Department for Education (DfE).

    Better-off pupils are significantly more likely to go to university than their more disadvantaged peers. And the gap between the two groups – 18.8 percentage points – is the widest it’s been since 2006/07.

    The latest statistics show that 26.3% of pupils eligible for FSMs went on to university in 2018/19, compared with 45.1% of those who did not receive free meals. Only 12.7% of white British males who were eligible for FSMs went to university by the age of 19. The progression rate has fallen slightly for the first time since 2011/12, according to the DfE analysis.


    Quality Training

    From Raconteur. A recent report by global learning consultancy Kineo examined the learning intentions of 8,000 employees across 13 different industries. It found a huge gap between the quality of training offered and the needs of employees. Of those surveyed, 85 per cent said they , with only 16 per cent of employees finding the learning programmes offered by their employers effective.


    Other Pontydysgu Spaces

    • Pontydysgu on the Web

      pbwiki
      Our Wikispace for teaching and learning
      Sounds of the Bazaar Radio LIVE
      Join our Sounds of the Bazaar Facebook goup. Just click on the logo above.

      We will be at Online Educa Berlin 2015. See the info above. The stream URL to play in your application is Stream URL or go to our new stream webpage here SoB Stream Page.

  • Twitter

  • Recent Posts

  • Archives

  • Meta

  • Categories